Traffic impacts
To safely complete this work, EPCOR may need to periodically close the alley directly behind the substation. We will work to keep alley closures as minimal as possible throughout the rest of construction.
When closed, pedestrian and vehicle traffic will not be able to pass through the alley, but access to parking and parking garages in the alley will be maintained on either side of the substation. Residents and visitors to the area will need to use either 112 Street or 111 Street to access the back alley.
Power outages
No power outages are anticipated as part of this work.
Construction equipment
Residents will experience noise typical to construction as various equipment and trucks are used for this work. Vehicles on site include EPCOR and contractor vehicles, fork trucks and flatbed trailers.
Noise
This project may be noisy at times. We will comply with the City of Edmonton’s Community Standards Bylaw for Noise Control. If it is necessary to temporarily exceed acceptable noise levels, we will work with the City of Edmonton to obtain the necessary permits.
Workspace
All work areas will be safe and secure. All construction activities will be in accordance with the City of Edmonton bylaws, Occupational Health & Safety requirements, and EPCOR’s strict health, safety and environment procedures and guidelines.