Skip ribbon commands
Skip to main content

​​​

​Zone D – 106 Street from 40 Avenue to Whitemud Drive

Four worksite locations will support the construction process, with anticipated timelines as follows:

  • ​​​Worksite #7 - Intersection of 106 Street and 40 Avenue – Summer 2023 to Spring 2024
  • Worksite #8 - Southbound on 106 Street and south of 41 Avenue – Summer 2023 to Summer 2024
  • Worksite #9 – Southbound on 106 Street and south of Whitemud Drive – Fall 2023 to Summer 2024
  • Worksite #10 – Northbound on 106 Street and south of Whitemud Drive – Early 2024 to Summer 2024​
Worksites 7 & 8
Worksites 9 & 10

​Anticipated Zone D Impacts - Worksites 7 & 8

​Traffic​​​
Worksites 7 & 8
  • ​The southbound left hand turning lane from 106 Street onto 40 Avenue will be closed. Vehicles will be able to turn left from the one remaining open lane.
  • One northbound and one southbound lane will be closed on 106 Street from 40 Avenue to north of DS MacKenzie Junior High. One lane will remain open in each direction.
  • No left hand turns will be permitted from the Duggan Mall exits onto southbound 106 Street.
​Sidewalks/walkways
​Worksite 7
  • ​The crosswalk across 106 Street on the north side of 40 Avenue will be closed. Pedestrians will be det​​our to the north.​
​​​Other
DS MacKenzie Junior High drop off and pick up area on the west side of 106 Street will be
reduced. A reduced area will remain open between Worksite #7 and Worksite #8 for student
drop off and pick up.
​Working Hours

Typical hours of work will be from 7:00 a.m. to 7:00 p.m., Monday to Saturday. If required, these hours may be extended, and construction may occur on Sundays from 9:00 a.m. to 5:00 p.m. During tunneling, the tunnel boring machine will be running 24/7 at Worksite #7 and #8.​
​Haul Route
Trucks and equipment will access the worksites from 106 Street and 40 Avenue. Additional
temporary lane closures may be in effect. Hauling activity will not be performed during student pick-up and drop off times as identified by DS MacKenzie Junior High and St. Augustine.

Please note, impacts may change based on City of Edmonton Traffic approvals. Advanced notification will be provided to residents and businesses in the local area before work begins.

​Anticipated Zone D Impacts - Worksites 9 & 10

​Traffic​​​
Worksites 9
  • ​One southbound lane on 106 Street between 42 Avenue and Whitemud Drive will be closed.​

​Worksite 10

  • ​The northernmost access into Whitemud Crossing from 106 Street south of Whitemud Drive will be closed.
  • The northbound right turn lane onto eastbound Whitemud Drive will be closed. Vehicles will be able to turn at the intersection.​
​Sidewalks/walkways
​Worksite 9
  • The sidewalk on the west side of 106 Street between 42 Avenue and Whitemud Drive will be closed. Pedestrians will be detoured to the east side.​
Working Hours

​Typical hours of work will be from 7:00 a.m. to 7:00 p.m., Monday to Saturday. If required, these hours may be extended, and construction may occur on Sundays from 9:00 a.m. to 5:00 p.m.​
​Haul Route

Trucks and equipment will access all the worksites from 106 Street. Temporary lane closures
may be in effect.

Please note, impacts may change based on City of Edmonton Traffic approvals. Advanced notification will be provided to residents and businesses in the local area before work begins.​