​Zone C – 106 Street from 36A Avenue to 38 Avenue

Two worksite locations will support the construction process, with anticipated timelines as follows:

  • ​Worksite #5 - Intersection of 106 Street and 36A Avenue – Summer 2023 to Spring 2024
  • Worksite #6 - Northbound on 106 Street and north of 36A Avenue – Summer 2023 to Spring 2024​

​Anticipated Zone C Impacts

​Traffic​​​
Worksite 5​
  • ​​A full road closure of 36A Avenue at 106 Street.
Worksites 5 and 6
  • Two northbound lanes on 106 Street between 36A Avenue and 38 Avenue will be closed. The southbound lanes will be converted to one lane in each direction to allow two-way traffic.
  • Access will be ma​intained to Garden Grove Condominiums from 106 Street.​
​Sidewalks/walkways
​Worksite 5
  • ​No crossing will be permitted across 106 Street on the north side of 36A Avenue. Pedestrians will be detoured to the south crossing.
  • No crossing will be permitted across 36A Avenue on the east side of 106 Street. Pedestrians will be detoured to the west side of 36A Avenue.
​Other

​Worksites 5 and 6
  • ​​No parking will be permitted on the west side of 106 Street north of 36A Avenue for
    approximately 75 metres alongside Duggan Elementary School.
​Working Hours
Typical hours of work will be from 7:00 a.m. to 7:00 p.m., Monday to Saturday. If required,
these hours may be extended, and construction may occur on Sundays from 9:00 a.m. to
5:00 p.m. During tunneling, the tunnel boring machine will be running 24/7 at Worksite #5.
​Haul Route
​Trucks and equipment will access all the worksites from 106 Street. Temporary lane closures
may be in effect. No hauling will occur during school drop off and pick up times.

Please note, impacts may change based on City of Edmonton Traffic approvals. Advanced notification will be provided to residents and businesses in the local area before work begins.