Power
Water
Drainage
Natural Gas
Phone: (250) 954-5337Call us 24/7.
Phone: (250) 951-2460Email: frenchcreek@epcor.com
Other contact information
Monday to Friday: 8 a.m. - 4:30 p.m.Weekends and stat holidays: closed
The Information on this Page Applies to:
At Worksite #1B, we'll construct a manhole shaft, which is similar to a shaft for micro-tunnelling, however, it is smaller in size. This manhole shafts will be use to connect the new tunnel to existing drainage infrastructure as well as to provide future access to the drainage system.
During this work, you'll encounter: