Want us to test your EPCOR meter? We'll make sure it's operating within prescribed standards.
Our site is customized by location. Please select the region of your service and we’ll remember your selection for next time.
Select a region for customized content and rates
Looks like you're in Canada
Looks like you're in the United States
Select a region for customized content and rates
Select a region for customized content and rates
Select a region for customized content and rates
Some of our services are provided at an extra cost.
The service application fee is $25 for all new or changed water services accounts within the City of Edmonton.
While the rates below apply to all of our customers, they most commonly apply to seasonal customers who request water and meter connections and disconnections.
Up to 25mm meter | $200 |
40mm to 50mm meter | $300 |
Over 50 mm meter | Actual cost |
Seasonal meters | Actual cost |
Want us to test your EPCOR meter? We'll make sure it's operating within prescribed standards.
Up to 25mm meter | $200 |
40mm to 50mm meter | $275 |
Over 50 mm meter | Actual cost |
Seasonal meters | Actual cost |
We can repair or replace damaged water valves, meters, remote meter reading devices or other EPCOR equipment or appurtenances that are located on a customer's property.
Actual cost plus $100
Applicable if you miss a scheduled appointment with an EPCOR representative.
$60.00 per missed appointment
Applicable if one of our representatives misses a scheduled appointment with you without giving reasonable notice.
$35.00 credit to customer per missed appointment
Applicable if you don't allow us access to read your meter for a six consecutive months.
$40.00 per month
Applicable to all of our customers who obtain water service through fire hydrants.
Hydrant application fee, annual | $90.00 per permit |
Hydrant meter service charge | $50.00 per month |
Consumption charge | $1.9341 per m3 |
Applicable if you obtain water at a site during the construction period, prior to the premises going into account for billing.
Construction service charge is $0.44 / $1000 of construction cost.
Rates payable in advance. No refunds.
Applicable if you request a water service to be turned on or turned off (excludes turn-on related to non-payment on account).
During regular hours | $130 per site visit |
Required outside regular working hours | $160 per site visit |
Required within 48 hours of request | $240 per site visit |
Applicable if you request a water service to be turned on or turned off (excludes turn-on related to non-payment on account).
During regular hours | $80 per site visit |
Required outside regular working hours | $100 per site visit |
Required within 48 hours of request | $120 per site visit |
Applicable if you live within the City of Edmonton and receive standby water service to your private fire protection installation.
Fire Line Service Size | Monthly Charge |
---|---|
50 mm | $1.41 |
100 mm | $8.70 |
150 mm | $25.27 |
200 mm | $53.86 |
250 mm | $96.86 |
300 mm | $156.45 |
These rates are applicable if you obtain water from a truckfill site within the City of Edmonton municipal boundaries.
Account application fee | $35.00 |
Consumption charge | $4.00 per m3 |
Applicable if you require a meter reading on a date other than when it's normally scheduled to be read that month.
$12.52 per off-cycle meter read
Applicable if we must complete your monthly meter read in person for:
Please do not use, alter, change or repair any EPCOR assets, such as a water valve or hydrant. This charge is applicable if a customer damages or tampers with one of our assets.
Actual cost to repair plus $250
Applicable if we make a service call to thaw your frozen water service.
View service connection fees.
$20.00
Type of Fee | Cost |
---|---|
Service call for sewer obstruction investigation | $410.00 |
Removal of obstruction (sewer obstruction investigation required before removal; both fees will be applied) | $255.00 |
Second and subsequent sewer investigation appointments (within 30 days of initial service call) | $214.05 |
Missed obstruction removal appointment fee | $214.05 |
No-access fee | $214.05 |
Type of Fee | Cost |
---|---|
Permit to release application fee (per year of permit term) | $202.90 (GST exempt) |
Compliance approval application fee (per year of approval term) | Subject to estimate based on cost of service |
Application for utility credit fee (per application) | $428.09 (GST exempt) |
Renewal application fee | $240.80 |
$64.21
Sewage delivered by truck to the Poundmaker Wastewater Transfer Station (less the first steering axle): $28.12/axle (GST exempt).
Wastewater having a settleable solids concentration greater than 100ml/l will be charged twice the rate of the above (for 2024: $56.24/axle, GST exempt).
The cost of this service is $152.03 plus GST per titled lot and is invoiced the month after the record search is issued.
This search covers records for information related to the following sections of past and present City Bylaws: Sewers Bylaw 9425, Sections 4 – 38; Sewers Use Bylaw 9675, Sections 4 – 37; Drainage Bylaw 16200, Sections 4 – 40 and 50 – 51; Drainage Bylaw 18093, Sections 15 – 20; EPCOR Drainage Services Bylaw 18100, Schedule 2; EPCOR Water Services and Wastewater Treatment Bylaw 17698, Schedule 1, Part IV, Wastewater Overstrength Surcharges and EPCOR Drainage Services & Wastewater Treatment Bylaw 19627 Schedule 1 & 2. These requests can be sent to drainagerecordsearch@epcor.com and require the following information:
See expedited service fees and other charges for electricity and natural gas.
See drainage service guidelines for additional information you may need when dealing with service application fees and special rates for drainage services.