​The following drawings and data are required for approval of the project.

Drawing/Data Proposal Approvala Verified
Manufacturer's equipment data sheet    
 Control schematic  
Single-line diagram indicating proposed protection settings
Description of protection scheme
Generator nameplate schedule  
Fuse and protective relay coordination study and settings  
Current transformer characteristic curve  
Commissioning report, complete with protection settings    
Plot plan showing location of lockable, "visible" disconnect device

a. The minimum time requirement for review of information will generally be 10 working days.