The Information on this Page Applies to:
Each of our projects align with the Shared Outcome Statements and Design Principles that were established with input from special interest groups, recreational users, community members and residents near the treatment plant. These icons show the Shared Outcomes and Design Principles for this project.
See all of our shared outcomes and design principles
Refine
We used your feedback to evaluate the feasibility of this project and the design options considered by EPCOR.
Public engagement framework
Content here
We're planning on:
This project increases the safety of staff and community partners using this entrance to access the Gold Bar Wastewater Treatment Plant. Our records indicate that over the past couple of years we had the following number of visitors coming to site for tours of the facility:
The students that tour the facility through the RiverWatch Alberta program get out of their rafts at the boat launch and walk on the paved multi-use pathway to the pedestrian gate mentioned above.
As shown on the image below, minimal undergrowth removal is required to install the stairway. We will replace removed vegetation in alignment with the recommendations included in our Vegetation Plan. The design of the stairway will minimize impacts to existing terrain and ground conditions.
As shown below, EPCOR will install a wooden staircase, which is the standard used by the City of Edmonton in the river valley.