Power
Water
Drainage
Natural Gas
After-Hours Emergencies
Phone: (705) 445-1800 option 7
Customer Service
Phone: (705) 445-1800Hours: Monday to Friday, 8:30 a.m. – 4:30 p.m.
Other contact information
The Information on this Page Applies to:
Each of our projects align with the Shared Outcome Statements and Design Principles that were established with input from special interest groups, recreational users, community members and residents near the treatment plant. These icons show the Shared Outcomes and Design Principles for this project.
See all of our shared outcomes and design principles
Refine
We will use your feedback to evaluate the feasibility of this project and the design options currently being considered by EPCOR. We will strive to incorporate your feedback about revegetation and visual aesthetics into the project design and share these refinements with the community.
Public engagement framework
Content here
We're gathering preliminary feedback on the feasibility of:
This project is being considered as it increases the safety of staff and community partners using this entrance to access the Gold Bar Wastewater Treatment Plant. Our records indicate that over the past couple of years we had the following number of visitors coming to site for tours of the facility:
The students that tour the facility through the RiverWatch Alberta program get out of their rafts at the boat launch and walk on the paved multi-use pathway to the pedestrian gate mentioned above.
As shown on the image below, minimal undergrowth removal would be required to install the stairway. We would replace removed vegetation in alignment with the recommendations included in our Vegetation Plan. The design of the stairway or steps would minimize impacts to existing terrain and ground conditions. Based on public feedback, if this project were to proceed it would be initiated in 2021.
As shown below (design options A and B), we're currently assessing different design options for the proposed stairway.
We're still working with the City of Edmonton to determine if Design Option B is a feasible alternative.
Credit: DIY Network