Impacts at 148 Street and Summit Drive

At the first work location (green area on map), a shaft has been constructed and the tunneling phase is underway.

During this work, you'll encounter:

  • A closed sidewalk on the north side of Summit Drive with detoured pedestrian traffic (orange line on map)
  • Westbound lane closure on Summit Drive (red line on map)
  • Regular construction activities from Monday to Saturday, 7:00 a.m. to 6:00 p.m. 
  • Work taking place 24 hours a day during the tunneling period
  • Heavy traffic along the haul route; tandem trucks and equipment will be coming down the haul route 5-7 times a day
 

 

​Haul route

The haul route for this work location is as follows:

  • Trucks will enter the worksite on Summit Drive from 149 Street.
  • Trucks will exit the work area at 148 Street and continue south and exit to 149 Street via 100 Avenue.