​Impacts at 148 Street and 99 Avenue

At this work location (green area on map), the shaft construction is still underway to retrieve the tunnel boring machine (TBM). The TBM will then tunnel west to the work location at 150 Street and 99 Avenue.

During this work, you'll encounter:

  • A closed sidewalk on the north side of Summit Drive with detoured pedestrian traffic (orange line on map)
  • 148 Street will be closed north of 99 Avenue (red line on map)
    • The lane will remain open during Candy Cane Lane to allow one way north-south traffic. Flagging personnel will be there to ensure safety.
  • Regular construction activities from Monday to Saturday, 7:00 a.m. to 6:00 p.m. 
  • Work taking place 24 hours a day during the tunneling period.
    • Working hours will be reduced during Candy Cane Lane. Construction will be modified to stop at 4:00 p.m. to allow vehicle access.
  • Holiday themed construction site hoarding will be put in place coincide with Candy Cane Lane activities
  • Heavy traffic along the haul route; tandem trucks and equipment will be coming down the haul route 5-7 times a day

​Haul route

The haul route for this work location is as follows:

  • Trucks will enter the worksite from 149 Street onto 100 Avenue.
  • Trucks will exit the worksite on 99 Avenue to 149 Street.

Possible additional work

A second shaft location may be necessary on 99 Avenue for Stage 2 of this project.

  • Possible location: Just west of the 99 Avenue and 147 Street intersection
  • Possible timeline: To be determined

Information on this location will be communicated when details are confirmed.