Power
Water
Drainage
Natural Gas
Tel: 1 (888) 765-2256
Email:gas@epcor.com
Other contact information
825 Lake Range Drive Kincardine, OntarioN2Z 0B3
The Information on this Page Applies to:
Sewer Guidelines
Drainage Service Guidelines
Provide a site mechanical plan and a site grading plan (if not included on the mechanical plan) directly to the Water and Sewer Servicing Section of Drainage Planning and Engineering. This plan of the on-site private water and sewer systems must include:
Pre-treatment facility plans, if applicable, for on-site treatment prior to discharge to the public sewer system. The plans must include an assessment of soil contaminants on the site and the potential to release subsurface water to storm sewer system, and the assessment to release industrial wastewater to sanitary or combined sewer system in contravention of the Drainage Bylaw.
Construction charges are determined based on the fee schedule for services of different sizes and configurations or specific estimated cost for non-standard services.
The construction charges must be paid in advance of the construction scheduling by cheque only and payable to “EPCOR”. Please note all written construction quotes are subject to revision within 30 days.