Power
Water
Drainage(780) 412-4500
Natural Gas1-800-511-3447Edmonton
Manage your account online: Log in
Phone (in Alberta only): 310-4300Toll-Free (outside of Alberta): 1-800-667-2345
Other contact information
Monday to Friday 8 a.m. - 7 p.m.Saturday 8 a.m. - 4:30 p.m.Sunday & Stat Holidays Closed
The Information on this Page Applies to:
Water and Sewer Connections Guidelines
Drainage Service Guidelines
Provide a site mechanical plan and a site grading plan (if not included on the mechanical plan) directly to the Water and Sewer Servicing Section of Drainage Planning and Engineering. This plan of the on-site private water and sewer systems must include:
Pre-treatment facility plans, if applicable, for on-site treatment prior to discharge to the public sewer system. The plans must include an assessment of soil contaminants on the site and the potential to release subsurface water to storm sewer system, and the assessment to release industrial wastewater to sanitary or combined sewer system in contravention of the EPCOR Drainage Services and Wastewater Treatment Bylaw 19627.
Construction charges are determined based on the fee schedule for services of different sizes and configurations or specific estimated cost for non-standard services.
The construction charges must be paid in advance of the construction scheduling. You may pay by cheque payable to “EPCOR” or by Electronic Funds Transfer. Please note all written construction quotes are subject to revision within 30 days.