Power310-9473Okotoks
Water(403) 938-1230
Drainage
Natural Gas1-800-511-3447Okotoks
Phone (in Alberta only): 310-4300Toll-Free (outside of Alberta): 1-800-667-2345
Hours of operation and mailing address
Phone (403) 938-1230Fax (403) 938-5962
The Information on this Page Applies to:
It is the owner’s/developer’s responsibility to make a request to EPCOR for the installation of new water and/or sewer services, or modification of existing services at the owner’s expense. EPCOR is responsible for the construction of the services from EPCOR mains to the property line only. The owner/developer is responsible for all works on private property. Only EPCOR crews are allowed to perform work within utility right-of-ways and construct services from the mains to the property line.
Provide EPCOR with the size and location of the storm, sanitary and/or water services required for the property along with address and legal description of the property.
Weeping tile flows must be discharged to a dedicated storm or foundation drain service where available, or discharged by an alternative method as directed by EPCOR. This includes new developments for single detached, semi-detached or duplex houses where provided and capacity exists.
Read the sewer guidelines.Read the sewer connection guidelines.Drainage plan submission checklist.
If no requirement for a storm or foundation drain service exists, roof leader discharges must be directed on the property away from the foundation and abutting neighbour's property.
Single family and duplex developments adjacent to the river banks or ravines must provide private storm drainage systems unless exempted by geotechnical evaluation that has been approved by EPCOR.
Please note that the minimum sewer elevation available vs. what would be required to service a deep basement is reviewed with the owner.
The construction charge is determined based on the fee schedule for sewer services of different sizes and configurations, or a specific estimated cost for non-standard services which involve extra deep services, main/service extensions from non-abutting mains, relocation of other utilities and extra manholes.
The service connection charges must be paid in advance of the construction scheduling by cheque only and payable to “EPCOR”.
Each half of a semi-detached dwelling must be individually serviced with water and sewer services directly off EPCOR mains.
Water and sewer services within the private property cannot be used to service another separately titled property regardless of who owns the properties.