Tools to keep your project on track
Our guides and checklists offer valuable information when you're building a new home or renovating an existing property.
Water and drainage
- Customer Connection Guide
- Hydraulic Network Analysis Process Overview
- Design Guidelines – Sanitary Flow Generation for Neighborhood Design Report, Water Consumption and Fire Flow for Hydraulic Network Analysis
- City of Edmonton Design and Construction Standards Volume 3 - Drainage
- Current version (effective August 1, 2025):
- Volume 3-01: Development Planning Procedure and Framework
- Volume 3-02: Stormwater Management and Design Manual
- Volume 3-03: Design Guidelines
- Volume 3-04: Pump Station and Forcemain Design Guidelines
- Volume 3-05: Drawing Requirements, Approvals, and Asset Acceptance/Transfer
- Volume 3-06: Construction Specifications and Standard Drawings
- Approved Product List (effective June 2026)
- Previous version (for designs submitted before August 1, 2025):
- Current version (effective August 1, 2025):
- City of Edmonton Design and Construction Standards Volume 4 - Water
- Drainage Service Guidelines
- Erosion and Sedimentation Field Manual
Related documents
- PD Water CCC/FAC Inspection and Checklist
- PD Wastewater CCC/FAC Inspection and Checklist
- Water Appurtenance Information
- Wastewater Appurtenance Information
- Water and Drainage Service Connections Simplified Checklist
- Plan Submission Checklist
- As-built forms
- Water As-Built Quantities & Costs Report
- Wastewater As-Built Quantities & Costs Report
- Chlorine Residual and Bacteriological Sampling Report
- Flushing Report
- Hydrant Flow Test Request
- Hydrostatic Testing Report
- Site Inspection Report - CCC
- Site Inspection Report - FAC
- Thrust Block Report and Concrete Test Results
- Wastewater Structure Report and Concrete Test Results
- EPCOR Wastewater Mandrel Test Template
- Water As-Built Quantities & Costs Report
Power
- Power Customer Connection Guide for guidance on how to successfully request services
- Customer Connection Guide – updated May 2026 (effective August 6, 2025)
- City of Edmonton Design and Construction Standards Volume 7 – 2026 Power (Greenfield Development)
- City of Edmonton Design and Construction Standards Volume 7 - 2024 Power Obsolete (Greenfield Development)
- Technical Requirements for Interconnection and Interoperability of Distributed Energy Resources on EPCOR's Electric Distribution System
- Power service for multi-unit dwellings
- Becoming a micro-generator (solar panels)
Owners of a single-family residence who plan to install electrical wiring personally may also apply for an electrical permit with the City of Edmonton. You must have the knowledge and capability to personally complete the installation. An inspector will review your installation plans with you before a permit is issued.
Electrical permits may be issued to an electrical contractor who is licensed in the City of Edmonton.
How to apply for an electrical permit
- When you go to the Permits and Licensing Service Centre, bring your personal identification showing your current address.
- You may need proof of ownership if your home has been purchased within the past six months.
Note: Electrical permits are cancelled after ninety days if no inspection has been requested and all installations require at least one visit from an electrical inspector.
Contact us
Questions about permits you might need or inspection services? Contact the City of Edmonton at 311 or 780-442-5311.
See the status of your project – anywhere, anytime
Did you know that you can track your project status online?
Your questions are important to us.
Water and drainage
Phone: 780-496-5444
Email: wass@epcor.com
Power
Phone: 780-412-3128