This document sets forth the guidelines for connecting a power producing facility to the Alberta Interconnected Electric System through EPCOR’s electric distribution system as managed by EPCOR Distribution & Transmission Inc. (EDTI). This guideline assists in determining the application, commissioning, operating and maintenance requirements of the facility and the responsibility of the parties.
Download the application guide: