Edmonton Meter Reading Schedule
All electricity retailers can access EPCOR Distribution & Transmission Inc.'s meter reading schedule and determine the next meter reading date for sites.
Schedule For Electricity Retailers:
How to find the meter reading schedule for a site:
- From the Site/Meter Reading Route Reference table, identify the site id and its matching Meter Reading Route number (site id and meter reading route is separated by a comma), e.g. 0030111638754,23080.
- Use the Meter Reading Route number; i.e. 23080, look up Meter Reading dates from the Meter Reading Schedule.
Exceptions
- Most of the meters in EPCOR Distribution & Transmission service area are read bi-monthly with an exception of high electricity usage sites (average monthly consumption exceeded 6200 kWh or meter demand over 35 kVA ) which will be scheduled to read monthly.
- Interval meter sites, unmetered sites and sites which are de-energized for more than 1 year are excluded from the Site/Meter Reading Route Reference table.
Note: Both the Site/Meter Reading Route Reference table and the Meter Reading Schedule are scheduled to update monthly or when the information is available.
|