Edmonton Meter Reading Schedule

All electricity retailers can access EPCOR Distribution & Transmission Inc.'s meter reading schedule and determine the next meter reading date for sites.

 

Schedule For Electricity Retailers:


How to find the meter reading schedule for a site:

  1. From the Site/Meter Reading Route Reference table, identify the site id and its matching Meter Reading Route number (site id and meter reading route is separated by a comma), e.g. 0030111638754,23080.

  2. Use the Meter Reading Route number; i.e. 23080, look up Meter Reading dates from the Meter Reading Schedule.

Exceptions

    • Most of the meters in EPCOR Distribution & Transmission service area are read bi-monthly with an exception of high electricity usage sites (average monthly consumption exceeded 6200 kWh or meter demand over 35 kVA ) which will be scheduled to read monthly.

    • Interval meter sites, unmetered sites and sites which are de-energized for more than 1 year are excluded from the Site/Meter Reading Route Reference table.

Note: Both the Site/Meter Reading Route Reference table and the Meter Reading Schedule are scheduled to update monthly or when the information is available.



Related Information
For specific customer sites, see Edmonton Meter Reading Schedule in Business Resources